Packaged HVAC replacement and installation

A coordinated, engineering-led approach for rooftop units and packaged systems—from field assessment through verified turnover.

Three coordinated solutions

The scope is defined before the crane arrives.

Each project begins with field verification and proceeds through a controlled sequence of engineering, procurement, installation, startup, testing, and turnover.

01

End-of-life replacement

Replace retired, unreliable, or inefficient packaged units with a properly selected system and a clearly defined installation scope.

02

New-build installation

Coordinate equipment, curbs, duct connections, electrical requirements, controls, ventilation, startup, and closeout.

03

Commissioning engineering

Verify airflow, temperature performance, ventilation, controls, electrical operation, drainage, safeties, and manufacturer requirements.

Commissioning deliverables

Documented verification—not a startup assumption.

The final verification scope is tailored to the system and contract requirements. Typical packaged-unit commissioning includes the following checks.

Supply, return, and outside-air measurements

External static pressure and fan operation

Temperature and humidity performance

Economizer, ventilation, and control sequences

Voltage, amperage, phase, and safety checks

Condensate drainage and installation quality

Refrigerant and manufacturer startup data

Deficiency documentation and corrective action tracking

Project workflow

A repeatable process for safer, clearer delivery.

STEP 1

Assess

Verify existing equipment, site access, electrical, controls, ventilation, roofing, and operating constraints.

STEP 2

Engineer

Confirm capacity, application requirements, scope boundaries, sequence, equipment, and project risks.

STEP 3

Install

Coordinate procurement, rigging, curbs, ductwork, electrical, controls, startup, and site protection.

STEP 4

Verify

Test operation, document results, correct deficiencies, and provide a clear turnover record.

Start with a field assessment

Replace it right. Verify it works.

Tell us about your facility, equipment, and schedule. Our team will review the project and identify the next practical step.